Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The first step in the mobile apps packaging process is the project (app) registration. It is necessary for the template to be readied before proceeding with the registration process. The next step after registration is to trigger the build and package the app. The CM team must refer the Mac PC Setup for Centralized Mobile Build Server (CMBS) Setup for instructions on the server setup.

...

The pictorial representation of the systems used, roles and responsibilities of the teams and the mobile build workflow are as follows:







Refer the following pages:

Page Tree
rootPackaging Mobile Apps Using CMBS