Editing Report Schedules
To edit the report schedules, perform the following steps in the Sigma Application:
Click the Schedule tab and select the schedule (e.g. Account Transactions Scheduler 1498), which requires modifications.
Make the necessary changes to the selected report schedule and click the Update option to update the modified report schedule.
A confirmation message appears.Click Ok.
Copyright © Intellect Design Arena Limited.
All rights reserved. These materials are confidential and proprietary to Intellect Design Arena Limited and no part of these materials should be reproduced, published in any form by any means, electronic or mechanical including photocopy or any information storage or retrieval system nor should the materials be disclosed to third parties without the express written authorization of Intellect Design Arena Limited.