Running Report Bursting Manually

To generate a ad-hoc report burst schedule, perform the following steps:

  1. Hover on an existing burst report configuration and click the three vertical ellipses.

  2. Select the Run Now option to run the report bursting.


    Note:
    The Run Now option is enabled only when no instances are InProgress or queued. To view why it is disable, hover on the exclamatory mark to see the error message.


    A confirmation message appears, indicating the run now of the report schedule and the Triggering Run Now status is displayed for the report schedule.


    The status of the burst report is changed to Triggering Run Now on left hand side of the bursting screen.



Copyright © Intellect Design Arena Limited.

All rights reserved. These materials are confidential and proprietary to Intellect Design Arena Limited and no part of these materials should be reproduced, published in any form by any means, electronic or mechanical including photocopy or any information storage or retrieval system nor should the materials be disclosed to third parties without the express written authorization of Intellect Design Arena Limited.